CO2H2O Solutions
←Retour au siteTRACKING: LOCAL TEST
Assessment0%
Industrial keg washing

What is limescale really costing your keg washer?

Estimate the operational impact, quantify only the scale-related costs you actually know, and identify a provisional MEDIAGON configuration.

BRASSERIE DE CHIMAY · LAMBRECHTSA documented industrial application, not a generic case

CO2H2O has documented a Lambrechts keg-washer application at Brasserie de Chimay. The full before/after evidence appears again with your result.

⚙️
Target equipment

Industrial keg washer

Technical sizing + OPEX + indicative ROI
Step 1 · Your line

Tell us about the keg washer

Start with information production or maintenance usually knows immediately.

Step 2 · Water & installation

What do you know about the installation?

Unknown values must never block the assessment. They can be validated later by CO2H2O.

Country and known machine data can be prefilled from a campaign link so prospects do not re-enter what CO2H2O already knows.
Step 3 · Operating impact

Which scale-related costs can you quantify?

Answer only what you know. Empty fields are excluded from the calculation — no automatic saving percentage is applied.

Enter only costs you know
Water, cleaning & wastewater

Quantify the downstream cost of extra cleaning water

Only enter water and treatment costs that are specifically linked to scale-related cleaning, descaling or additional rinsing. Leave unknown values blank.

Extra water
Heating / pumping
Chemicals
Wastewater
Treatment plant
Country values are available as benchmarks, but they are not included until you enter or apply them.
Initial assessment

Your line is worth a closer look

We reveal useful feedback before asking for professional contact details.

What we can already confirm
Selected cost areas0
Line rate—
Technical status—
Estimated annual impact€ 00,000
Proposed recoverable savings€ 00,000
Simple indicative payback00 mo
Professional access

Where should we send the technical summary?

A short professional contact step: company, person, email and phone in international format.

Use the international prefix, e.g. +32 486 77 90 20
Why we ask
  • Attach the result to the right site.
  • Send the complete assessment.
  • Allow technical sizing review if requested.
  • A phone number in international format is required to access the full result.
Your industrial assessment

Technical validation case

This estimate uses only the values you entered. Empty or unknown items are excluded. Final sizing and commercial conditions require technical validation.

Executive summary

ROI indicatif
—
—
—
Quantified annual scale-related cost—
Quantified monthly cost—
Equipment budget—
Provisional configuration—
Technical fit

Calculation logic

Only values entered by the prospect are included. Water, wastewater and treatment-plant costs are counted only when the prospect quantifies them. No automatic saving assumption is added.

What is included in this estimate?

Quantified by you

Downtime, descaling, chemicals, parts, energy, water, wastewater and treatment costs only when you provide a value.

— / year
Not quantified

Potential impacts without a value are listed separately and do not increase the calculated ROI.

—

Quantified cost structure

Only costs with a value entered by the user are included.

Maintenance & production—
Water & extra cleaning—
Wastewater & treatment—

Potential impacts not automatically included

These operational effects are important, but they are intentionally excluded until you quantify them.

Washing qualityValve closing or washing defects
Machine throughputLoss of production efficiency
Steam heat exchangersReduced thermal performance
Bath cleaningHot water, mixed water and caustic bath maintenance

Items not quantified in your estimate

These fields were left blank or marked unknown. They are shown here for follow-up, but they do not increase the calculated result.

Comparable field application

Brasserie de Chimay · Lambrechts keg washer

The 2016 profitability note for the Brasserie de Chimay application documented €373/month in direct recurring costs (chemicals, labor, parts) and explicitly excluded several performance-related impacts. The case is a historical reference, not a universal performance coefficient.

Heat-exchanger pipes · before / after

Before heat-exchanger pipes
Heat-exchanger pipes · beforeZoom
After heat-exchanger pipes
Heat-exchanger pipes · afterZoom

Valve heads · before / after

Before valve heads
Valve heads · beforeZoom
After valve heads
Valve heads · afterZoom
Choose the next step

Receive the assessment

Get the summary and the values used in the calculation by email.

Schedule a phone review

Review the data, assumptions and provisional sizing with CO2H2O.

Share machine information

Send machine photos, nameplate, P&ID, technical sheet or pipe information for validation.

CO2H2O Solutions · Technical summary preview
CO2H2O Solutions
Industrial assessment — executive summary
Recipient: —
Company: —
Date: —
Lead ref.: —

—

Calculated result

Quantified annual cost
—
Quantified monthly cost
—
Equipment budget
—
Provisional configuration
—
Indicative ROI—

Information provided

Information not provided / not quantified

Notes for technical review

—

Choose the next step